The rules at a glance
Sources: NSW Government, BCNSW eCert portal (updated 1 July 2026), Electrical compliance requirements, and Advisory note 2/2026, When to submit a CCEW (updated 2 September 2026). All read 19 October 2026.
Do I need a CCEW for this job?
Tap the job.
Advisory note 2/2026, updated 2 September 2026.
Advisory note 2/2026, updated 2 September 2026.
NSW Government, BCNSW eCert portal page, updated 1 July 2026.
NSW Government, Smart meter safety and installation requirements, updated 1 July 2026.
NSW Government, Using work management software integrated with BCNSW eCert, updated 29 June 2026.
When is it due?
Seven calendar days from the day you finished the safety and compliance test. No weekend or public holiday extension is written anywhere.
Regulation s37A, quoted in the advisory note: “no later than 7 days after completing the test”. The date stays on your device, this page sends nothing anywhere.
The portal in five stages
This is the portal route. The software route skips the typing but ends at the same place, a certificate issued by Building Commission NSW.
- Log in with your individual licence. Licence number with no spaces or dashes, password, then the 6-digit code emailed to you. Company and partnership licences cannot register. The login page and every fix.
- Pick the electrical work tile, then new work or rectification. Rectification needs the written direction notice. “Some questions in the form may not apply to your work. You should only complete the sections that apply.”
NSW Government, Creating a new CCEW, updated 2 September 2026.
- Installation, equipment, customer and site. Installation type, the work, exactly where on the site, each piece of equipment with its rating and count, then the customer and the street address (type it slowly, the search misses fast typing). Save and continue after every screen, “If you close or refresh your browser before selecting this button, your entries will be lost.”
NSW Government, Installation details, Equipment details, Customer and site details, all updated 2 September 2026.
- Tests, the test date, NMI and network. Earthing continuity, insulation resistance, polarity, circuit connections, and every RCD you installed or replaced, those are the regulation's own list. If someone else tested it, they must hold a current licence and be registered in eCert, and they get 30 days to finish their part.
NSW Government, Test details, updated 2 September 2026; regulation s36 as quoted in Advisory note 2/2026.
- Declaration, privacy notice, submit. Tick that the work complies, accept the privacy collection notice, review, submit. The PDF certificate is emailed to you, to the customer if you gave their email, and recorded by Building Commission NSW. After that it can be viewed but not edited.
NSW Government, Reviewing declarations and submitting, updated 2 September 2026; Viewing and downloading submitted certificates, updated 31 August 2026.
Before you open the form, 13 things
Tick them off on the job. Nothing is saved, so a shared laptop keeps no history. Print it for the ute if you like.
Four jobs, what goes on the certificate
Made-up jobs, real field names. No test readings, because the CCEW doesn't ask for readings, it asks which tests you did.
- Work
- Like-for-like replacement of a fixed appliance
- Installation
- Residential
- Where
- Kitchen, oven cavity
- Equipment
- 1 oven, hard wired
- Tests
- Earthing continuity, insulation resistance, polarity, circuit connections
- Tester
- You
- Work
- Additions or alterations to a switchboard
- Installation
- Residential
- Where
- Meter box, garage wall
- Equipment
- 1 switchboard 63 A, RCDs as fitted
- Tests
- Earthing continuity, insulation resistance, polarity, circuit connections, RCD operation on every device
- Network
- Your distributor (Ausgrid, Endeavour Energy, Essential Energy)
- Work
- Solar PV and battery installation
- Installation
- Residential
- Where
- Roof array, inverter on the garage wall, battery beside it
- Equipment
- Inverter, battery, isolators as fitted
- Tests
- Earthing continuity, insulation resistance, polarity, circuit connections, RCD operation
- Network
- Your distributor, NMI from the bill
- Work
- Metering work
- Installation
- Residential
- Where
- Meter box
- Equipment
- Smart meter as fitted
- Tests
- As the metering form asks
- Network
- Your distributor, NMI
Who gets the certificate
- Building Commission NSW records it. The portal is the system of record, whichever way it was sent.
- You get the PDF by email, to the address registered on your portal account.
- The customer gets a copy if their email was on the form.
- Your employer, if you said yes to sharing a copy, and the distributor where supply is involved.
NSW Government, Creating a new CCEW and BCNSW eCert API for the electrical industry (“Certificates are emailed to the electrician and distributed to the employer, customer, and distributor (if applicable).”), read 19 October 2026.
The six things that go wrong
I lost everything I typed
“Your form is only saved when you select Save and continue. If you close or refresh your browser before selecting this button, your entries will be lost.” Save after every screen, especially on a phone that sleeps.
NSW Government, Creating a new CCEW, updated 2 September 2026.
The tester I assigned can't see the job
The other electrician “must hold a current electrician's licence and be registered in BCNSW eCert”. Not registered, no job. Their notification comes from donotreply_BCNSW@customerservice.nsw.gov.au, so check junk.
NSW Government, Test details, updated 2 September 2026.
The assigned certificate vanished
“If there is no activity on the certificate for 30 days, it will be automatically removed from BCNSW eCert. Once removed, it cannot be recovered and the installing electrician will need to create a new certificate.” The tester has 30 days, and so does the certificate.
NSW Government, Accessing your assigned jobs, updated 2 September 2026.
I need to fix a submitted certificate
“Once submitted, a certificate can be viewed but cannot be edited.” Check the review screen like it is the last time you will see it, because it is. A wrong certificate means a conversation with Building Commission NSW, not an edit button.
NSW Government, Viewing and downloading submitted certificates, updated 31 August 2026.
The customer didn't get their copy
Their email has to be on the form. For a certificate sent by software, the electrician's copy goes to the email registered on the portal account, not the one the software has, if they differ.
NSW Government, Creating a new CCEW; Using work management software integrated with BCNSW eCert, updated 29 June 2026.
My software won't send a rectification CCEW
Correct, none can. “Rectification CCEWs cannot be submitted on your behalf through an integrated business or software system.” Portal, rectification of work, written direction notice in hand. The seven days still count.
NSW Government, Using work management software integrated with BCNSW eCert, updated 29 June 2026.
Or send it from the job
In Yamate the job already has you, your licence, the customer and the site. You tick the installation, the work, the equipment and the tests, check the sheet and send. Building Commission NSW checks your licence and issues the certificate, same as the portal. Included on every paid plan from $19/mo (founder price, until 30 Nov), no certificates add-on. Watch the real app do it, 52 seconds.
Try Yamate free for 30 days, no card →Questions
Does a like-for-like replacement need a CCEW?
Yes. The September 2026 advisory names water heaters, ovens, stove tops and electrical accessories.
When does the seven days start?
When you finish the safety and compliance test, not when you invoice. Calendar days.
Can I still use the paper book or the PDF form?
No, not since 1 July 2026. Portal or an approved software connection.
Who lodges it, me or my boss?
The tester, in their own name, under s37A. The employer can get a copy. If software sends it, the regulator says “you remain legally responsible for the CCEW”.
Does a solar job need a CCEW through eCert?
Yes, solar and battery installations included, since 1 July 2026.
Do I need a portal account if my software sends it?
Not to send. Register with your individual licence to see and download your certificates, they are stored there either way.
What does a late CCEW cost?
Regulation s37A carries 20 penalty units for an individual, 40 otherwise. Giving false information is a Crimes Act offence on top.
Can I edit a certificate after submitting?
No. Viewed, not edited. Get it right on the review screen.
Every rule above is Building Commission NSW's, quoted from the page linked beside it and read 19 October 2026. The regulator's page wins if this one falls behind. Yamate is independent of Building Commission NSW and not endorsed by it. No licensed electrician has reviewed the job examples yet, when one does, their name goes here.