Skip to content
Call or text 0436 599 588Try the demoHelpContactLog in
Yamate › Pricing & quoting › Deposits

How much deposit can a tradie ask for?

For ordinary trade work, there often isn't a fixed legal deposit percentage. Regulated residential building contracts are different: most states cap the deposit, commonly at 5–10% depending on the state and contract value.
Being asked for 50%? Check your state and the type of job before you pay it.

Check the deposit for your job

State
Job
$
Want another quote before you pay?

Describe the job and find someone nearby. No account needed.

Find another tradie →

Being asked for a 50% deposit?

For regulated residential building work, 50% can exceed the legal cap by a long way. For ordinary trade or custom work, the answer can be different.

Check your state and job type above before paying.

Two different rules apply

Ordinary trade work

Usually no legal percentage cap. Most plumbing, electrical, painting, landscaping, appliance, cleaning and handyman jobs. The deposit is by agreement.

Regulated residential building work

State deposit caps can apply. Building work on a home above the state's written-contract threshold — a renovation, an extension, a deck, a new build — done under a building contract. Asking for more than the cap is a breach.

Legal deposit maximums by state (residential building work)

These caps apply to regulated residential building contracts above each state's written-contract threshold — not to a quick service call. Each figure was read at the regulator on 22 September 2026.

StateMaximum depositRegulator
NSW10% of the contract priceNSW Fair Trading / Building Commission NSW
VIC10% under $20,000 · 5% at $20,000 or moreConsumer Affairs Victoria
QLD20% up to $3,300 · 10% ($3,301–$19,999) · 5% at $20,000+ · up to 20% if more than half the work is made off siteQBCC
WA6.5% of the contract price, on fixed-price work of $7,500–$500,000Building & Energy (Home Building Contracts Act)
SA$1,000 if the work is up to $20,000 · 5% if over $20,000Consumer & Business Services
TAS5% on work of $20,000 or more · 20% if more than half the work is made off siteConsumer, Building & Occupational Services
ACTNo legal limit — industry practice is up to 10%ACT Planning
NT5% under the standard schedule for prescribed work over $25,000; a different schedule needs the prescribed formNT Building Practitioners Board
⚠️ These are the caps for regulated building contracts. A 50% deposit on that kind of work is a breach in the states with a cap, and can be reported to the regulator named above.
Want another quote before you pay?

Describe the job and find someone nearby. No account needed.

Find another tradie →

What's normal on an ordinary trade job?

The deposit should make sense for the money committed before work starts. Jobs with little material cost may need little or no deposit. Material-heavy or custom work may justify more upfront.

  • Small jobs, few materials — often no deposit, or a small amount to lock in the booking.
  • Material-heavy jobs — enough to cover what has to be bought before the work starts.
  • Big or custom orders — staged payments at milestones rather than one big amount up front.

Whatever the number, it belongs on the quote before anyone pays — the amount, what it covers, and when the balance is due.

Taking a deposit and going quiet is also prosecutable, not just bad form. In 2024 a WA court ordered a paver who took a 50% deposit and never started to refund the $2,535 plus a $4,000 fine, and the Commissioner's words were “you are breaking the law if you take money from customers and don't undertake the work in a reasonable time.”

Source: Consumer Protection WA, Paver pays for taking money without doing work, read 3 October 2026.

Before a deposit changes hands

  • Get it in writing — the deposit amount, what it covers, and the payment terms, on the quote that is accepted.
  • Pay it before materials are ordered, not before there is a quote — a deposit follows an agreed price.
  • For building work, the written contract comes first — no deposit before the contract is signed.
  • Use a trackable payment (PayID, bank transfer or a card link) so there is a clean record on both sides.
Did this answer your question?

FAQ

Is there a legal limit on tradie deposits in Australia?

Only for regulated residential building work, where most states set a maximum (often 5–10%; WA 6.5%; the ACT none). For ordinary trade jobs there is no legal cap — the deposit is by agreement, and it should be reasonable and in writing.

Can a tradie ask for a 50% deposit?

On regulated building work in a state with a cap, no — that is a breach. On an ordinary job it is legal but unusual; a deposit that covers the materials is the fairer approach, and a big custom order is better handled with staged payments.

When is the deposit paid?

Once the quote is agreed and before materials are bought — and, for building contracts, only after the written contract is signed. Pay it by a method that leaves a record.

Related

Deposit limits for home jobs, state by state · What a written quote must include · Am I being ripped off by this quote?

General information, not legal advice. Deposit caps apply to regulated residential building contracts and vary by state; thresholds and rules change — confirm the current detail with your state building regulator before relying on it.