Decking Calculator (Australia)

Lineal metres of decking, the joists and bearers under it, and the screws to fix it down. Counts the gap between boards as cover, because that is where most decking orders go wrong.

Australian Standard — figures not yet verified
⚠️ Heads up: these figures haven't been signed off yet. The maths is right and the sources are named below, but nobody at Yamate has yet re-read them against the current edition of the standard. Treat this as a working estimate, not a checked one — and confirm anything that needs sign-off with the standard itself, your certifier or your building surveyor.
The way the boards run. Joists sit across this direction.
Measured across the boards. This is what the board rows have to fill.
The board itself. 86 and 136 are common hardwood, 90 and 140 common in treated pine.
3mm for boards that will shrink, 4–5mm for dry ones that will swell. More on wide boards.
Off the board maker's spec sheet. 450 is common for 19mm hardwood.
This is the joist span — it comes from AS 1684, not from this page.
Random lengths are cheaper but leave more offcut and more end joints.
Ten on a rectangle. Fifteen if there are returns, angles or a picture frame edge.
Put these numbers straight into a quote →

How we worked this out

Boards run the length of the deck. Each row covers its own width plus the gap beside it, so the width of the deck divided by that cover is how many rows you need.

  • Board rows = deck width ÷ (board width + gap), rounded up
  • Decking to order = rows × deck length × (1 + waste)
  • Joists = deck length ÷ joist centres, rounded up, plus one
  • Bearers = deck width ÷ bearer centres, rounded up, plus one
  • Screws = rows × joists × 2 — two fixings at every board-over-joist crossing

Spans are not calculated here. Joist and bearer sizes and spans come from the AS 1684 tables against your species, grade and deck height.

Where the figures come from: Counts boards, joists and bearers at the spacings YOU enter. Joist and bearer spans come from AS 1684 span tables and are not selected here.

⚠️ Check this against the current edition before you rely on it. Australian Standards are published and sold by Standards Australia — we can't reproduce the text here, so the figures above follow published guidance on what the standard requires. Editions change. For anything that needs sign-off, confirm with the standard itself, your certifier or your building surveyor.

What a decking order is actually made of

Four separate counts, and they don't scale together. Boards go up with the area, joists go up with the length only, bearers go up with the width only, and screws go up with both at once. That's why guessing a deck off "so many square metres" lands wrong — you'll be close on boards and nowhere near on fixings.

The gap is not spare — it's cover

An 86mm board laid with a 4mm gap covers 90mm of deck. Over a 4m width that's 45 rows instead of 47 — and on a 6m long deck those two rows are 12 lineal metres of decking you didn't need to buy. On a big job the gap is worth real money, which is why every board maker publishes a cover width.

BoardGapCoverLineal metres per m²
66 × 19 hardwood4 mm70 mm14.3
86 × 19 hardwood4 mm90 mm11.1
90 × 22 treated pine4 mm94 mm10.6
136 × 19 hardwood5 mm141 mm7.1
140 × 22 treated pine5 mm145 mm6.9

How big should the gap be?

It depends on how wet the board is the day you screw it down, and nothing else much.

  • Boards that arrive wet — a lot of merbau and unseasoned hardwood comes off the truck heavy. It is going to shrink. Lay it tight, around 3mm, and the gap will open on its own over the first summer.
  • Kiln-dried boards stored under cover — these will take up moisture once they're outside and swell. Leave 4–5mm or you'll get boards buckling against each other.
  • Wide boards move more. A 140mm board changes width roughly twice as much as a 70mm one for the same moisture change. Go bigger on the gap.
  • Never zero. Water and leaf litter have to clear, or the deck rots from the top surface down. Three millimetres is a practical floor.

Sticker the pack on site for a week or two before you lay it, out of the rain and off the ground. Boards that acclimatise on the job move less afterwards than boards laid straight off the truck.

A worked example

A 5.0m × 3.0m deck, 86 × 19 hardwood at a 4mm gap, joists at 450 centres, bearers at 1800, boards bought in 5.4m lengths:

  • Rows: 3000 ÷ 90 = 33.3, rounded up to 34 rows
  • Decking: 34 × 5.0 = 170 m, plus 10% waste = 187 lineal metres — that's 35 lengths
  • Joists: 5000 ÷ 450 = 11.1, rounded up to 12 bays, so 13 joists at 3.0m = 39 m
  • Bearers: 3000 ÷ 1800 = 1.7, rounded up to 2, so 3 bearers at 5.0m = 15 m
  • Crossings: 34 × 13 = 442, at two screws each = 884 screws — two boxes of 500

Joist and bearer spacing

Joist centres are set by the board, not by you. Most 19mm Australian hardwood decking is specified at a maximum of 450mm; some 22mm treated pine allows a bit more; composite and capped boards often want 300–400mm, and anything laid diagonally needs the centres tightened because the board is spanning further between supports. The number is on the board maker's spec sheet — use theirs.

Bearer centres are a different question entirely: that spacing is the joist's span, and it comes out of the AS 1684 span tables against the joist section, the species and grade, and whether the deck is close to the ground or up in the air. 1800mm is a common starting point for 140 × 45 treated pine joists on a low deck, but treat it as a placeholder until you've read the table.

Screws, and the ones that don't rust out

Two fixings per board at every joist is standard — it stops the board cupping and lifting at the edge. Use 65mm decking screws into 19mm board, pre-drill and countersink in hardwood so you don't split the ends, and keep fixings about 15mm in from the board edge.

Near the coast or over a pool, use grade 316 stainless. Inland, class 3 coated is usually enough. Cheap screws on an expensive deck is a false economy you get to look at every day — the rust bleeds down the face of the board within a season.

Before you build

A deck more than a metre above the ground generally needs a barrier around it, and often needs building approval — the threshold and the process vary by state and council. Check with your local council before the bearers go in, not after the boards do.

Built for carpenters, handymans. See how Yamate handles quotes, invoices and getting paid for Carpenters · Handymans — or grab a free carpenter quote template.

Deck priced up. Now send the quote.

Yamate turns the board metres, the subframe and your hours into a quote the customer accepts on their phone — then the invoice, then the payment. GST sorted, follow-ups chased.

Try Yamate free → Free to try · no card · sign in with a link, no password to remember

Decking FAQ

How many decking boards do I need?

Divide the deck width by the board width plus the gap to get the number of rows, then multiply by the deck length. A 6m × 4m deck in 86mm boards at 4mm gaps is 45 rows × 6m = 270 lineal metres before waste.

What spacing should decking joists be?

Most 19mm Australian hardwood decking is specified at a maximum of 450mm centres. Some 22mm softwood allows more, composite boards often want 300 to 400, and diagonal laying needs the centres tightened. Use the board maker's spec sheet.

How big a gap between decking boards?

Around 3mm for boards that arrive wet and will shrink, 4 to 5mm for kiln-dried boards that will swell once they're outside. Wider boards move more, so give them more. Never lay tight — water has to drain.

How many screws for a deck?

Two per board at every joist. A 6m × 4m deck at 450 joist centres works out around 1,350 screws — three boxes of 500. Buy the extra box; running out on a Sunday costs more than it saves.

How far apart should deck bearers be?

Bearer spacing is the joist span, and it comes from the AS 1684 span tables against your joist size, species, grade and deck height. 1800mm is a common figure for 140 × 45 treated pine on a low deck, but read the table for your build.

Do I need council approval for a deck?

Often, and the threshold varies by state and council — height above ground, size and whether it's attached to the house all matter. A deck more than a metre up also needs a barrier. Ask your council before you start.

General information for Australian trades, and an estimate only — not tax, financial or legal advice. It is not engineering, building or design advice either: a calculator works out a quantity from the figures you enter, and anything that needs sign-off still needs your engineer, certifier or building surveyor. This tool counts boards, joists, bearers and fixings at the spacings you enter. It does not select joist or bearer sizes or spans, footing sizes, or bracing — those come from AS 1684, your board manufacturer's specification and your engineer. Australian Standards are published and sold by Standards Australia and are not reproduced here. Confirm anything structural with your certifier or building surveyor.